Skip to content
Evason Building Contractors

Case study

Project Berkswell

RenovationSutton Coldfield6 months2025

The build, in order

From a stripped shell to a finished home.

  1. 1. Back to brick

  2. 2. Groundworks

  3. 3. Finished

The brief

A complete renovation of a house that had been left to go. Inside, a full back-to-brick strip-out, then a new layout, a loft conversion, new kitchen, new bathrooms and new flooring throughout. Every service renewed with it: a dual-system central-heating installation, a full rewire, and a security system with CCTV and alarms. Outside, front and rear gardens that had been completely overgrown, to rebuild from scratch.

The challenges

The condition, and the sheer breadth of it. The inside had to come back to brick before any of the finish could start, and the gardens had been lost to nature entirely. A renovation on this scale is really a dozen trades in the right order: structure and strip-out, then the loft, then heating, electrics and the CCTV and alarm system first-fixed into bare walls, then kitchen, bathrooms and flooring, and the gardens cleared and rebuilt last so the finished work is not carried back through. Getting that sequence right across one house is the job.

What we built

A house that reads as new behind its original brick: an open, re-planned ground floor, a loft turned into usable rooms with its own shower room, two marble-tiled bathrooms, a shaker kitchen on patterned tile, and every service - heating, power, security - renewed rather than patched. Outside, the overgrown plot is a porcelain patio, a level lawn and a gravelled drive.